top of page
Eastcoast Concrete Logo transparent pinellas park florida commercial contractors
St. Johns county water treatment facility drawings plans eastcoast concrete

ST. JOHNS

St. Johns County Water Refinement Facility

State Road 207, St. Augustine, FL

The State Road 207 Water Reclamation Facility represents the largest capital improvement initiative ever undertaken by St. Johns County Utilities Department, with a total investment of approximately $191.8 million. Strategically located west of Interstate 95 along State Road 207, the facility is designed to significantly expand the County’s wastewater treatment capacity while transitioning toward a more sustainable water reuse model. Once operational, the plant will initially process 3.25 million gallons per day, with infrastructure in place to double that capacity as regional demand increases.

The scale and complexity of the SR 207 facility highlight EC Concrete’s ability to execute large, technically demanding projects. With initial treatment capacity of 3.25 million gallons per day—expandable to 6.5 MGD—the facility includes multiple interconnected structures requiring exacting tolerances and coordination with mechanical and process systems. EC Concrete’s role supports not only the structural integrity of the plant but also the seamless integration of treatment technologies, contributing to the overall efficiency and reliability of the operation.

At the core of this landmark project, EC Concrete plays a vital role in delivering the structural foundation that makes the facility possible. Water reclamation plants demand highly specialized concrete construction, from cast-in-place treatment basins and process tanks to equipment foundations and structural slabs designed to withstand constant exposure to moisture, chemicals, and heavy operational loads. EC Concrete’s expertise ensures that these critical components are built with precision, durability, and long-term performance in mind—meeting the rigorous standards required for municipal water infrastructure.

Beyond construction, EC Concrete’s involvement reflects a broader commitment to building infrastructure that benefits communities and the environment. By supporting a facility that will significantly reduce nutrient discharge and expand reclaimed water use, EC Concrete is helping St. Johns County advance toward sustainable water management goals while protecting surrounding ecosystems. This project stands as a testament to EC Concrete’s capability, craftsmanship, and dedication to delivering high-performance concrete solutions on projects that matter.

bottom of page